Harga Satuan Upah Kerja Bangunan - AHS 2011


 
NO
URAIAN
SATUAN
UPAH (Rp.)
1
Mandor
Org/hr
Rp 80,000.00
2
Kepala Tukang Batu
Org/hr
Rp 75,000.00
3
Kepala Tukang Kayu
Org/hr
Rp 75,000.00
4
Kepala Tukang Besi
Org/hr
Rp 75,000.00
5
Kepala Tukang Cat
Org/hr
Rp 75,000.00
6
Kepala Tukang Listrik
Org/hr
Rp 75,000.00
7
Kepala Tukang
Org/hr
Rp 75,000.00
8
Tukang Batu
Org/hr
Rp 65,000.00
9
Tukang Kayu
Org/hr
Rp 65,000.00
10
Tukang Besi/Baja
Org/hr
Rp 65,000.00
11
Tukang Cat
Org/hr
Rp 65,000.00
12
Tukang Listrik
Org/hr
Rp 65,000.00
13
Tukang Pipa
Org/hr
Rp 65,000.00
14
Tukang Plitur
Org/hr
Rp 65,000.00
15
Tukang Taman
Org/hr
Rp 65,000.00
16
Tukang
Org/hr
Rp 65,000.00
17
Pembantu Tukang
Org/hr
Rp 42,000.00
18
Pekerja Biasa
Org/hr
Rp 42,000.00
19
Penjaga Malam
Org/hr
Rp 42,000.00
20
Sopir
Org/hr
Rp 65,000.00
21
Operator
Org/hr
Rp 75,000.00
22
Mekanik
Org/hr
Rp 65,000.00
23
Pembantu Sopir
Org/hr
Rp 42,000.00
24
Pembantu Operator
Org/hr
Rp 50,000.00
25
Pembantu Mekanik
Org/hr
Rp 42,000.00
harga sudah termasuk PPN dan keuntungan




 